granite tiles laying 60/sq ft.how to convert in sq mt,what
is the mltiplying value.
Answers were Sorted based on User's Feedback
Answer / divyesh s mistry
1 sq.metre=10.76sq.ft
so square metre of 60 sq.ft=60/10.76=5.57sq.mtr
| Is This Answer Correct ? | 14 Yes | 3 No |
how we calculate the vol.of wet concrete..?
How do you determine or evaluate success?
In barbending schedule why is o.42*D is taken. Means why o.42 only???
I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?
Father of "reinforced cement concrete"?
What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
2 Answers RPP Infra Projects, SIL,
shape of aggregates used in concrete should be rounded/cubical or elongated/flaky.
how much thickness of roof truss?
What is the weight of Plunger used in Vicat Apparatus used for testing of cement for knowing standard consistency.How many grams of cement is generally used for this test?
What is thumb rule in quantity and cost estimation of a residential building?
0 Answers Ascent Constructions,
how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t
WHY DO WE PROVIDE DEVELOPEMENT LENGTH AND EXTRA BARS AT TOP
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)