what is difference between tor steel & TMT STEEL?
Answers were Sorted based on User's Feedback
Answer / kameshwar mahto (saroj)
TORR- Ordinary bars. twisting operation while making hence
there is residual stress in it.
TMT- Thermo-Mechanically Treated Bars. no twisting operation
hence no residual stress in it which causes the high
strength bars. the strength comes on it from its rim.
| Is This Answer Correct ? | 36 Yes | 6 No |
Answer / mahij
TMT..BAR..
means a thermo mechanical process done on a steel bar..
| Is This Answer Correct ? | 31 Yes | 10 No |
Answer / salaidurai
Different between tor steel and TMT bar:
Tor steel is casted and tempered. TMT bar is tempered
mechanicaly while cating. that is thrmo mechanicaly treated.
| Is This Answer Correct ? | 25 Yes | 11 No |
Answer / raju
TMT- Thermo-Mechanically Treated Bars. no twisting operation
hence no residual stress in it which causes the high
strength bars. the strength comes on it from its rim.
| Is This Answer Correct ? | 11 Yes | 5 No |
Answer / prakash
TOR refers to cold treated bars
TMT refers to hot treated bars
| Is This Answer Correct ? | 0 Yes | 2 No |
What is the different type of slump test indications?
How many bricks required for 1 cu.m
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
component parts of a weir
4 Answers Infosys, L&T, Zamil Steel,
Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)
what is quantity of sand required to plaster wall about 1000 sq ft
what is mean by tremie concrete
where we use one way slab and two way slab?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
0 Answers National Construction Authority,
tmt steel
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)