what is difference between tor steel & TMT STEEL?
Answers were Sorted based on User's Feedback
Answer / kameshwar mahto (saroj)
TORR- Ordinary bars. twisting operation while making hence
there is residual stress in it.
TMT- Thermo-Mechanically Treated Bars. no twisting operation
hence no residual stress in it which causes the high
strength bars. the strength comes on it from its rim.
| Is This Answer Correct ? | 36 Yes | 6 No |
Answer / mahij
TMT..BAR..
means a thermo mechanical process done on a steel bar..
| Is This Answer Correct ? | 31 Yes | 10 No |
Answer / salaidurai
Different between tor steel and TMT bar:
Tor steel is casted and tempered. TMT bar is tempered
mechanicaly while cating. that is thrmo mechanicaly treated.
| Is This Answer Correct ? | 25 Yes | 11 No |
Answer / raju
TMT- Thermo-Mechanically Treated Bars. no twisting operation
hence no residual stress in it which causes the high
strength bars. the strength comes on it from its rim.
| Is This Answer Correct ? | 11 Yes | 5 No |
Answer / prakash
TOR refers to cold treated bars
TMT refers to hot treated bars
| Is This Answer Correct ? | 0 Yes | 2 No |
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
how to calculate total cost for slab 35'×8'
what is curing?
Can anyone tell me the thumb rule for calculating structural steel quantity?
How much quantity of rod binding work by a rod binder per day
Rust in Rod is harmful in structure because -––
HOW WE CALCULATE OR FIND OUT THE DEGREE OF FREEDOM IN A SIMLY SUPPORTED BEAM? IF THERE IS HINGE THEN HOW? & ALSO IN A PORTAL FRAME? PLEASE GIVE A EXAMPLE FOR EACH QUESTION.
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
Explain the advantages and disadvantages of using plastic and timber fenders?
What is the difference between RCC & PCC?
What is meant by solid geometry?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)