Did you handle any interior designing jobs?
Answers were Sorted based on User's Feedback
Answer / hanish sehgal
yes i handle the interior job but in my 6 month training in
ista hotel (amritsar) interior is very tough job
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / j.antony mariadas
Having Sixteeen years of experience in
Architectural,interiors & Civil Engineering. I have reached
a level where I wish to consolidate upon my experience in
the above field. I have held a variety of positions
including Architectural Assistant, Project Engineer. which
have seen me to achieve excellent results.With more
emphasis on Site jobs, I have been a person in finalizing
and completion of various projects.I am looking for an even
more challenging and rewarding role where I can completely
devote the skills. I have acquired throughout my career.
I was in-charge for the following projects in CHENNAI-INDIA.
: M/s. Zylog Systems, - Office (G.F,I,II & III )
Civil, Architecture & Interior -
Siruseri, Chennai.
Cost of project – 1533 lakhs
: M/s. HCL ( BPO ) Technologies ( I & VI ),
Mini Campus – IT Park
Civil, Architecture & Interior -
Thooraipakkam, Chennai.
Cost of project – 592 lakhs.
: M/s. Cognizant Technologies Solutions ( G.F, I & IV )
Civil, Architecture & Interior – Sun Tech Park
Solinganallur, Chennai.
Cost of project – 880 lakhs
: M/s. Mehta Jewellery.
Civil, Architecture & Interior
Alwarpet, Chennai.
Cost of project – 145 lakhs
: M/s Lata Rampadran, Residential Bungalow
Civil & Interior Works.
Alwarpet, Chennai.
Cost of project – 24 lakhs
: M/s. Soma sekar, Residential Bungalow
Mylapore, Chennai..
Civil & Interior Work.
Cost of project – 30 Lakhs.
: Hotel Saravana Bavan,
Kenneth Lane, Egmore,
Civil, Architecture & Interior
Cost of project – 85 Lakhs.
: Hotel Saravana Bavan,
AshokNagar, . .
Civil, Architecture & Interior
Cost of project – 65 Lakhs
My response as follow as:
Site Execution, Tender Preparation
:
To co-ordinate with consultants.
:
Measurement Take off & Site inspection
:
Instructions to contractors.
:
Bill Checking & Certificate.
:
Quality control of Materials & Workmanship
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / b. malar mannan
Yes, I am Doing Interior Works...
Flooring in Trident Hotel
Flooring in GRT Grand Hotel
Flooring in Karnataka Tourism Train [Golden Chariot].
Flooring in Le Royal Meridien.
Interior Works in Kodaikanal [India Cement].
Interior Works in 10 Independence Villas in Chennai.
Interior Works in 52 Cinema Theatres in Chennai.
Is This Answer Correct ? | 1 Yes | 0 No |
How can I make justification between using concrete grade c35 compare c37?
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
shear stress where is max.min in beams?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
What is the meaning of M50,20? What is 50,what is 20
one MT of steel for using how much binding wire required?
how to check and keep control on the wastage of material at site
0 Answers Aashray Design Consultants, ABC Infra, Jain Group,
please i wont to know the full meaning of P V C
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
give me the mix proportion for design mix concrete M10 grade 1:4:8
13 Answers Gammon, IOCL, PSL, SDG, Simplee, STUP Consultants Pvt Ltd,
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Two way slab, curtailment provided in both side in longside and short side. which side curtailment provided in one way slab?