Did you handle any interior designing jobs?
Answer Posted / hanish sehgal
yes i handle the interior job but in my 6 month training in
ista hotel (amritsar) interior is very tough job
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
What are the composition of a landfill?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
How to find permissible diagonal tensile stress in reinforced brick work
what is right & short method of measurement of slab&beam
how to calculate the density for high density concrete ? or is it same as the density of RC?
How many bricks are there in 100cft?
what are the Task work of different labour.?
though u r a civil engineer, y r u interested in tcs???
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
How many feet are in 4 square yards?
pls give me some basic informations in construction of a structure?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What is critical path method (c.p.m)?