why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
No Answer is Posted For this Question
Be the First to Post Answer
what is pouring and explain
What is kn measurement?
1m square 20mm plastering how much of water need curing work
How much lap length provided in compression and tension in bridges?
Brick work how many days curing and at any concreting pl
what is silica fumes or micro silica? and whr is it used? wat r its advantages?
purpose of binding wire in RCC. Structually is there any requirements that how to tie the binding wire like cross or single or how many pices combine together to bind the steel. i need structually importance of binding wire.
Please any body describe me manpower used calculation for a building construction.
1 Answers Metro Constructions,
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
please help me i want that steel bar weight kg/foot if anyone have formula so tell me .
Explain different types of rcc pipes.
How calculate the water for 1m3 concrete
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)