yet i am not got any hallticket from aai junior excequtive
exam.any one got application form from aai.
Answers were Sorted based on User's Feedback
Answer / ram
THIS WEBSITE IS PURELY DEDICATED TO INTERVIEW QUESTIONS SO
PLEASE DONT ASK THIS KIND OF QUESTIONS REGARDING HALL
TICKETS
| Is This Answer Correct ? | 8 Yes | 1 No |
How Much span required for 1 sqm of shuttering(Beam & Slab)
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
What is rate of concrete surface rendering work per sqm
how do you stabilize a waterlogged area in road construction
how many labour is required for 1cum of concrete?
what is the diferance np3 and np4 pipe
1 Answers Sharda Construction,
Sunk slab means what ?
UNIT Weight of 40mm, 20mm, 10mm Stone Aggregates
How to calculate Brick for 9"wall for100sqft
m30 mix proportion as per IS code
how much kgs should Cement,sand & aggregate to be added for 1cumt,mix is M15,M20,M25,M30
What is the specification of m40 grade concrete
2 Answers Era Infra Engineering, PSU,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)