What are the methods to do a estimate.
Answers were Sorted based on User's Feedback
Answer / bethina sudheer
Detailed estimate & abstract estimate and an estimate can be prepared by any of two methods by using long& short wall method and centerline method
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / suresh s sonone
1.detailed estimate
2.supplimentary estimate
3.revised estimate
| Is This Answer Correct ? | 3 Yes | 0 No |
what u mean by shoring?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
if a 1 storey building is constructed without columns&beams and having the thickness of walls 12" in which cement&sand mortar is used what is the lifespan of building
0 Answers Ryna Facilities Services,
Explain the water bound macadam roag
in M20 Mix concrete how much cement, sand and 20mm metal?
which percentage is maximum in good quality cement?
what type of drawing used in the field construction?
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
What is the distance between railway tracks?
what is the full form of following sueface type of road - AC,CC,(PM,DM,SB),(CG,Ma,Me), G,E,O
how to caliculate required amount of cement and sand required for 1cu.m.
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)