what is the requierd compressive strenth for m 20 grade concreat for
7 days?
Answers were Sorted based on User's Feedback
Answer / jaswinder singh
it is not less than 60% means that it come near about 12kn/mm
| Is This Answer Correct ? | 7 Yes | 1 No |
Answer / ashish sharma
its about 65% of 28 days compressive strength of concrete.
So for 7 days its about 13n/mm2.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / fm irfan
7 days compressive strength should be more then 2/3 of the
M 20 grade concrete that is may be more then 14 MPa(Mega
pascal).....
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / samyak jain
7 days compressive strength of concrete would not be less than 67% and it will be 13.5mpa
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / aabid
M20 grade of concrete 7 days strength 13.2 kN/ m3 is gain.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / eng. mohd noor salleh
75% of 20kn/m2 is required, i.e= 15kn/m2
| Is This Answer Correct ? | 0 Yes | 3 No |
Answer / sjtbehera
as per Is code- 456-2000 for M20 concete 7days strength
175kg/sqcm or 17.5 kn/sqmm
| Is This Answer Correct ? | 0 Yes | 3 No |
how can we calculate costing of a project per sqft/sqm
1 Answers Associate Consultant, AVT, L&T,
how can u extent the final setting time of cement?
3 Answers TNPSC Tamil Nadu Public Service Commission,
What is the difference between load bearing and non load bearing walls? How to distinguish both?
22. Are you willing to attend trainings, learn new skills and develop as a professional?
Providing and fixing in position Tor steel to footings, foundation, slabs, beams, columns, canopies, stair case, newels, chajjas, lintels, etc. including cutting, bending, hooking the bars, binding with wires. give me the rate M.ton.
What is the percentage of wastage in steel reinforcement n how to control it?
WHAT IS MEANT BY AEOLIAN SOIL?....
4 Answers L&T, Totem Infrastructure,
What is Bearing Capacity of Soil? How will you calculate for a particular type of Soil?
6 Answers Nagarjuna Construction, NCC, Ramky,
what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?
3 Answers Ashok Leyland, Marathon Realty,
you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons total mass.you are require to paint 1 cot of primer and 2 coats of top coat.How many liters of primer and top coat you will request
Did any of the egyptian pyramids ever fall down?
How many types of grades in concrete mixing
6 Answers White Horse Ventures,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)