5. Do you feel that your present employer estimates your
full work potential? Are they pleased with your work
performance?
No Answer is Posted For this Question
Be the First to Post Answer
which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
200sq.ft of slab and thickness is 6" in that how much cement are required(bags), sand & aggregates are in cu.m, choose grade of concrete is m20.
how bitumen is prepared for NH,SH &other roads
what is the procedure of wet seiving. n percentage of silt in different type of soil?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
How to calculate the quantity of water in cement mortar eg. CM 1:3?
how much steel required for 1 square meter slab?
plz tell me max persantage of sand for every mix design by volume or weight.
can any one explain structural behaviour of trapezoidal combined footing?
how to calculate 1 cubic meter rcc concrete 1:1.5:3 ratio ,how much aggrates and sand , quanitites
what is cement wastage percentage in NHAI ROAD WORKS
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)