How to find beam R/F cutting length
No Answer is Posted For this Question
Be the First to Post Answer
Key is put at the time of casting 1st lift of column to get– –
What the approval that owner will give to contractor during construction project period? What will the affect on project if delays due approvals?
what is meant by shear center?????
What is the dimension of Slump cone which is used to measure the Slump value of concrete? Slump value for Pile concrete? Slab concrete? Column concrete?
HOW WE WILL CALCULATE QTY. OF CEMENT,SAND & AGGREGATE (10MM&20MM) IN Kg.
4 Answers Nagarjuna Construction,
What is the strength of 1:6:12 mix?
wht is off shore structure
How to find the cement, sand, Aggregate, for m20, m25 grade of concrete..?
in the construction of building,we are use formula for laping? such that how many formulae we use? which are them?
what will be the quantity of matterial and water for pcc in 1 cubic meter , the ratio is 1:4:8 (cement:sand:aggr) ?
Terms Name the bars which is used in beam and colume ? Like starter bar etc.
What is rate of concrete surface rendering work per sqm
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)