construction workers how much time take one work or qty
No Answer is Posted For this Question
Be the First to Post Answer
which type of foundation are most prefarable in blockcotton soils
how to calculate concrete qty for footing using M25 grade 1:1:2 for 731 cft.
9 Answers Abuilding Lab, L&T, MPSC, Vellapally,
In a beam tension is always at the bottom but sometimes when we design using staad we get more number of rebars at the top compression zone Why?
How to find concrete quantity for a circular column ?
What do you mean by honeycomb in concrete?
how many kg reinforcement is required for G+ 1 roof slab of 1200qf slop slab with 5 inch thickness of house.
how many lab test on bricks and aggregate write briefly please
What is Aggrgate sizes used in a WMM Plant?
which has high coefficient of discharge venturimeter or orificemeter
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
In beams why we give lap in middle of top bars and at edges in bottom bars???
extra how much quantity need to fill the actual excavated quantity.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)