What is the least count of Theodalite survey?
Answers were Sorted based on User's Feedback
Answer / akshaya
The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.
| Is This Answer Correct ? | 6 Yes | 2 No |
sir i have 2700sq.ft area.i wish to make a coomercial space including this area.sir what could be the estimated cost of 3 story bulding in varanasi.
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
0 Answers Amit Enterprises, ICT,
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
can any give me bhel n other govt sec interview question
how many litres of enamel paint required for 5000 sft of site??
How do you to separate Marble and Granite. What are difference between them?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
How much lap length provided in compression and tension in bridges?
How we decide the depth and size of footing? Give a example?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
what is the size of moduler bricks
How you calculate cement,sand,20mmbluemetal,40mmbluemetal,bricks for various works
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)