What is the least count of Theodalite survey?
Answers were Sorted based on User's Feedback
Answer / akshaya
The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.
| Is This Answer Correct ? | 6 Yes | 2 No |
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
How much snowcem required per sq. Meter area
3 Answers Bhushan Power Steel,
Basic civil interview questions
what is the specification for silt content in sand
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
what is water cement ratio and how to calculate it after designing the concrete?
How long does it take concrete to harden?
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
What is a BBS?Find out the cutting length for a 600*600 foundation with 50 mm cover
Outline ten different ways in which typical bill of quantities can be used?
how many bags of cement required in neat cement finish per square metre
why we are condecting the slump test for concrete?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)