What is the least count of Theodalite survey?
Answers were Sorted based on User's Feedback
Answer / akshaya
The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.
Is This Answer Correct ? | 6 Yes | 2 No |
Clay and silt content in a good brick earth must be at least
what is the I.S. CODE of RCC
How much does the leaning tower of pisa lean?
what shape of coarse aggregates are ideal for concreting?
how to calculate the strength rebound hammer test if average reading of 50.6,50.2,49.1,50.5,50.8,51.7 in grade M-60
Can we use PPC cement for RCC works? Upto which grade it can be used?
what will be the grade for M 30 ,35,40,45,50,55???
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
what is Bearing Capacity,How to determine it?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
Define angular dimension?
How to calculate the lap length rod of column, Beam,Slab please give me a details?
4 Answers Ali Baba Engineering and Construction Company, Asha Realty Developers,