Answer Posted / akshaya
The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
What is the difference between chamfer and fillet?
which steel is better for residential building tmt steel or hysd steel
For fine aggregate which is most suitable River sand or crusher sand & why ?
How to calculate steel for beam slab and column
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What is Heavy Concrete & Normal Concrete
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
what is the breaking strength of wall tiles
how to find ssm in foundation?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
what are the ffactors you considered choosing the course?
What is hybrid foundation?
How to calculate the load of partion in flat slab if we use brick?
What is Curtailing of R/F
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever