As shown in IS 456-2000 minimum cement content is include
fly ash?
Answers were Sorted based on User's Feedback
What is alternate bid?
If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
how to cement bag calculate m25 grade
what is rigid pavement
How to calculate laplength for 3 floors
sir tell me what are the rules to find out the cut length? and what is the deduction in dia to be made ?
how to caluclate sienerge qty in construction in ap
what opc & ppc cement $ composition?
Define current ucs?
i have a bar of 20 and 16, lap length is 48*dia of bar, what is the lap length here
how many litres of enamel paint required for 5000 sft of site??
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)