Thumb rules for
1.brickwork & Blockwork
2.Plastering
3.FLooring and tiles
4.Shuttering
5.Steel
Answer / nitin sharma
brickwork & Blockwork:- flooer area 1time
2.Plastering:- internal floor area time and outer floor area 1time
3.FLooring and tiles:- floor area 1 time,not including toilet
4.Shuttering:- with beam floor area 1.5 time and including column 2time
5.Steel:-3.5 kg to 4.5 kg per sqf
Is This Answer Correct ? | 2 Yes | 0 No |
Two types of piling
how can u extent the final setting time of cement?
2 Answers Sobha Developers, TNPSC Tamil Nadu Public Service Commission,
Distinguation between Developing Length and Lapping Lengh
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
What in your past experience or education prepares you for the position for which you are applying
How much steel required in 900 square feet slab?
17 Answers RCC, Sai Steel Corporation, TATA,
on what basis the partial factor of safety are decided? form the load combinations
what should be the deduction for bend in stirrups while calculating cutting length? Is it 1 dia at each bend?
Name the standard sand for concrete tests
what is mean by reestimation?
0 Answers Ste Infrastructure Pvt Ltd,
Dfine superelevation.it depends upon which of the following. 1.surface condition of road 2.width of road 3.radius of curve 4.speed of vehicle
8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,