brickwork & Blockwork:- flooer area 1time
2.Plastering:- internal floor area time and outer floor area 1time
3.FLooring and tiles:- floor area 1 time,not including toilet
4.Shuttering:- with beam floor area 1.5 time and including column 2time
5.Steel:-3.5 kg to 4.5 kg per sqf
Is This Answer Correct ? | 2 Yes | 0 No |
Describe the advantages and disadvantages of using plastic and timber fenders?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
in the footings first which reinforcement bar has to be layed as per desi
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
what is mean by c32/40s concrete class
what"s the purpose of dry lean concrete(DLC)and where it"ll be use it?
how to take quantity in triangle section for calculating tender purpose
which things consider when the calculate the area of the flat?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.