Answer / nitin sharma
brickwork & Blockwork:- flooer area 1time
2.Plastering:- internal floor area time and outer floor area 1time
3.FLooring and tiles:- floor area 1 time,not including toilet
4.Shuttering:- with beam floor area 1.5 time and including column 2time
5.Steel:-3.5 kg to 4.5 kg per sqf
| Is This Answer Correct ? | 2 Yes | 0 No |
what is called fck
M40 grade concrete has 40 n/mm2 strength.here what"s mean by n?
how to calculate MR 9(derivation)
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
What is meant by Crystal Concrete?
for 1sft of Cement plastering ratio 1:3 How much quantity of cement and sand required.?
2 Answers CGL, URC Construction,
Why should pumping be not used in case of concreting works?
waht are pressure bulbs
what is the difference between red bricks& cement bricks
what is the difference between rcc pipe (pressure or non- pressure)and rcc hume pipe?
Why I-section is preferred to channel section?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)