Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is Wlak Test in Fire Alarm System????

Answers were Sorted based on User's Feedback



What is Wlak Test in Fire Alarm System????..

Answer / joy

walk in test in a FDAS is a built in program done in the
Fire alarm control panel where you can test each zones
assigned. It is an automatic testing program to see if all
detectors connected or located from different areas of the
building is really working or if one detector in a zone fails.

Is This Answer Correct ?    2 Yes 0 No

What is Wlak Test in Fire Alarm System????..

Answer / ravi

It is an Automatic Testing of Smoke Detectors..

By this onle one person can test the Smoke detector & d
panel will reset every 30Sec onces automatically......

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Electrical Engineering Interview Questions

What is the Derating factor of power cables when exposed to direct sunlight in (both PVC & XLPE).

1 Answers  


What safety followup during kWh meter isolation

0 Answers  


how many frequent start/stop operation possible in case of HT MOTORS.

5 Answers   DVC, Steel Plant,


i have total 8 dg sets for synchronizing and 2 buscoupler,1 sectoin dg no 1,2,3,and 2 sectoin dg no 4,5,6,and last section dg no 7,8 ....if buscupler no 1 and 2 is off mode ..than dg no 1,2,3,will synchroniz of another dg sets?

0 Answers   Crown Buildtech,


What is Energy Audit..?

2 Answers  


Please give me the formula stating relation between AC & Dc.

2 Answers   JP Group,


dear all, How do i increase UPS (1000VA)backup time ? i have connected 2 12v wold you please 120 aH battery externally. ups charge the lead acid battery only 12.7 volt. backup time only 10.00 minuts and gose off. can any one of you help me?

1 Answers   Technomax, ups,


what is the difference between isolator and circuit breaker

3 Answers  


what is rating boiler

0 Answers  


which %age if losses increases when frequency is increased to 25%

4 Answers   Maihar Cement, Siemens,


What is the purpose of starter and choke in tube light?

9 Answers   Chimay Brewery, TATA, TSPL,


Send the control circuit digram of a star delta stater?

1 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)