How to calculated capacitor rating both HT
Answers were Sorted based on User's Feedback
Answer / shashikant
connect the LT capacitor to the 3 phase AC suply, measure
the current & line voltage in each phase. Get the reading.
Calculate kVAR using formula kVAR = 1.732*(Avg.Line Voltage)
*(Avg current)/1000
| Is This Answer Correct ? | 34 Yes | 6 No |
Answer / rajib
KVAR=KW(tan@1-tan@2)
Where, @1= system power factor, @2= desire power factor
For example. 500KW motor has system power factor 0.8 and we want to improve it 0.95
tan@1=tan cos-1(.8)=0.75
tan@2=tan cos-1(.95)=0.3287
KVAR=500(0.75-0.3287)=210.65=210KVAR
and so on
| Is This Answer Correct ? | 20 Yes | 0 No |
Answer / dharmvir prasad
present pf cos @1 = 0.76
desired pf cos @2 = 0.90
@1=cos- 0.76= 40.536
@2=cos- 0.9= 25.842
tan @1=0.855
tan @2=0.484
tan@1-tan@2=0.37
0.37x kw of motor
| Is This Answer Correct ? | 17 Yes | 1 No |
capacitance of the capacitor is mentioned in KVAR.
Formula : KVAR = KW*tan@
FOR tan@, First note the power factor & KW without
connecting capacitor.
The noted power factor is in cos@.Convert the cos@ value in
tan@.
for ex. If power factor is 0.6, KW = 200
cos@ = 0.6
cos-1 (0.6) = 53.1
tan (53.1) = 1.333
200*1.333 = 266.6 KVAR
if you use 266 KVAR capacitor, Then the power factor
improves to unity (1.000).
| Is This Answer Correct ? | 20 Yes | 12 No |
Answer / giribalaaji
can anyone plz derive the formula for required KVAR ?
Required KVAR= KW* (tan@1-tan@2) i want to know how tan comes in the equation.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / mukesh tyagi
Above Answer is correct , so i agree with this perfectlty.
| Is This Answer Correct ? | 7 Yes | 6 No |
I would like to say that p.f =KW/KVA AND FORMULA IS KVAR =ROOT OF (KVA)SQURE -(KW)SQURE . THIS IS RIGHT ONE FORMULA
| Is This Answer Correct ? | 1 Yes | 0 No |
how the ac voltage are selected like 220v,415v,750v,1000v& 1.KV,6.6KV,11KV,33KV,66KV,132KV,220KV & why these are selected like these orders
HOW TO CALCULATE THE DOMESTIC POWER FACTOR?
Do you know how to joint the H.T and L.T Cables?
23 Answers KESC, MGVCL, Nokia, Oil Country Tubular, Power Control, SAGT, Siemens, Simco, Vivek Engineers,
how is positive, negative, zero sequence is happen.. how is effect on 3 phase system
what will happen if ac and dc supplies given
What are the advantages & disadvantages of a group electrive drive?
what is the Auto Mains Failure Panel function in DG?state its function?
why we test the core balance of the transformer?
WHY SECONDARY OF CT SHOULD NEVER BE KEPT OPEN CIRCUITED?
1.why we are using metal oxide gapless block in lightning arrester,2.What is minimum and maximum rating of metal oxide blocks using in india
cable selection formulas for electrical load.
opkinson's test
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)