in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.

Answers were Sorted based on User's Feedback



in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / gurucharan singh

Yes 100% you can directly step down from 33KV to 0.430KV.
You must take care transformer sizing should be as per LV
switchgear available at your end.

Is This Answer Correct ?    2 Yes 1 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / mandeep kumar

Yes it is possible to step down from33/.433kv But it can only depend upon the transformer turn ratio its ht turn will be in large nos than 11/.433kv.

Is This Answer Correct ?    1 Yes 0 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / anas

cuz u have to pass it first on substation (distribution
boards) to make it easier cut and start the current in case
of any fault happened and if u didnt do that damage we will
be easy not just easy very very very easy and cause the
transmission stations to damage and u will loss power when
u transform from 33kv to 430v directly ahuge amount of
current will be in the cable that means very huge cable
besides loads alaways
unbalanced..................................................
..................

Is This Answer Correct ?    4 Yes 4 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / balaji

the reason is to avoid the losses

Is This Answer Correct ?    0 Yes 0 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / ravinder

the rule of step down trf. 33kv\11kv step down in subsation
and get the one-by- one outgoing feeder's .

Is This Answer Correct ?    1 Yes 2 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / amit

FROM AMIT -SOHAM ELECTROWELL (P) LTD NASIK----WELL IF UR
LOAD IS ABOVE 1.5 MVA THEN THERE IS CHANCE OF fluctuation
ON 11KV~433 SO ITS BETTER U SHOUD GO FOR 33KV ~433V

Is This Answer Correct ?    3 Yes 5 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / devesh mishra

yes we can directly step down from 33/.433kv.
the lv side remains constant for 11 or 33kv & hv side
depends on load i.e,

for load upto 1.5 mva 11kv ht line is required,whereas
for load above 1.5 mva 33kv ht line is required

Is This Answer Correct ?    3 Yes 12 No

in our sub station why we step down firstly 33kv\11kv then 11kv to 430v. can we direct step down 3..

Answer / mahmud

cause of our transmission line is for 11kv

Is This Answer Correct ?    6 Yes 29 No

Post New Answer

More Electrical Engineering Interview Questions

What are the causes of eddy current losses?

1 Answers   Schneider,


- two pumps must work with them at the same time but if the first pump start the second pump  must delayed for some time to start  also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it

0 Answers  


why ht11kv supply needs discharging during shut down time

1 Answers  


What is PIR (pre inserting resistance) in 400kv EHV SF6 BREAKER? Why it use?

1 Answers   Adani,


draw tube light circuit

0 Answers   Badve, KPTL,






what is the min and max ohmic resistance for the earthing rod installed for lighting poles for street light network

1 Answers  


What are the operation carried out in thermal power station?

0 Answers  


Why transformer neutral earthing? What is advantages?

3 Answers  


how many units consumed by a 33/440 2000 kava transformer in a day

3 Answers   Infosys, MRF,


what is corona effect?

39 Answers   ABB, Genco, Wipro,


What is Control & Relay Panel? And Remote Control Center?

0 Answers   L&T,


what is the function of buchhos rely in transformer

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)