Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.

Answer Posted / ravinder

the rule of step down trf. 33kv\11kv step down in subsation
and get the one-by- one outgoing feeder's .

Is This Answer Correct ?    1 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the two basic types of transformers?

1232


11 kV line deraction check by an Engineer.

2036


High speed earth switch operation with diagram

2558


In a power conditoining unit (inverter) of a solar plant when we measure the d.c. current fed by different strings of solar plates to inverter, the current in the negative wire is less almost by 1 ampere to the current in its positive wire say current in positive wire 5 A , then current in negative wire of the same string is 4 A. Since the current entering should be equal to current leaving then why the current is noticably less in negative wire.

1656


why use phase displacement in transformer.and effect of phase displacement on transformer

2915


Why in 6 KV XLPE cable termination kit used and why not in 380 V xlpe cable same is not used

2693


in parallel operation of power transformer why the distance between power transformer and capacitor bank feeder is necessary to know

1857


Where voltage are high and current to be interrupted is low the breaker preferred is:

2347


Do you need any help with FEWA Electrical Supervisor exams?

1058


What is electrical grounding?

1262


i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.

2163


What is the necessary and sufficient condition for stability.

1185


diff b/w elcb and rccb

2347


All the socket in a room become very hot, the Wall was also became very hot and the earth conductor also became live, what in your view might be the possible causes?

1706


Why squirrel cage motor can only use with low starting loads ?

2109