in our sub station why we step down firstly 33kv\11kv then
11kv to 430v. can we direct step down 33v to 430.v.
Answer Posted / devesh mishra
yes we can directly step down from 33/.433kv.
the lv side remains constant for 11 or 33kv & hv side
depends on load i.e,
for load upto 1.5 mva 11kv ht line is required,whereas
for load above 1.5 mva 33kv ht line is required
| Is This Answer Correct ? | 3 Yes | 12 No |
Post New Answer View All Answers
What is the classification of hydro projects based on installed capacity?
I HAVE BEEN SELECTED FOR APGENCO A.E(ELECTRICAL) 2008.HOW MUCH WEIGHTAGE FOR INTERVIEW AND WRITTEN TEST.HOW I HAVE TO PREPARE. PLEASE GIVE INFORMATION IF U KNOW.WHAT ABT G.D THIS TIME.CALL RATIO 1:2
54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?
Is RTCC panel needs any control supply.
i need some project topics along with circuit diagram in the electrical adnd electronics engg and also give ome website regarding projects.my mail id is thenmozhi2k7@gmail.com .please help me.
What are the applications of autotransformers?
What is milivolt dop test in Busducts? What is its significance & procedure to do the test?
what is a pulse transformer? how rise time of pulse changes when ever the voltage changes?
What is stepper motor. What is its uses?
HOE WE CAN IMPROOVE BY USE OF CAPACITOR
Explain how you intend to work under pressure to meet up with deadline target?
Define the term factor of inertia.
How does the slip regulator works as a startor
Why hydropower stations are preferred solution for meeting peak loads in grids?
rajha power sector details