Answer / rajarshi basu
Keeping the casting of piling in mind on site,it would be
foolish to answer this kind of question as the concrete used
for casting is RMC where we dont get to know the proportions
of mixes the mix designer has used to design the specified
concrete.
Otherwise it is too simple to calculate from Nominal mix design
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / ameen chouhan
The ratio 1:1 is micro piles and 22bags per cum
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / s.r.shiradhonkar
vol of pile is 0.63 cum
Material required
Metal (0.80 cum/cum of concrete)i.e 0.8*0.61=0.488 cum
Sand (0.40 cum/cum of concrete) i.e 0.4*0.61=0.244 cum
cement(0.40 cum/ per cum), (as cement sand ration mentioned
1:1). cement required= 0.4*.0.61=.244 cum. 1bag of 50 kg
have volume 0.035 cum. there for bags required=0.244/.035=
7 bags.
S.R. Shiradhonkar
Amarawati.
Is This Answer Correct ? | 6 Yes | 7 No |
Answer / dushyant bansal
For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
8. Volume of pile -.61m³
If you given cum your ratio is 1:1:2 not 1:1
Total ratio=1+1+2 = 4 so cement = .61/4=.1525m³= 4bags
Sand=.1525cum
Agg.=.1525*2=.305m³
Is This Answer Correct ? | 5 Yes | 20 No |
what is the density of coarse sand
Explain moment of inertia?
A lorry contains 3-Units of material(Sand/Metal/Gravel...) so 3-Units means how many (CFT and M3)
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
What is the use of extend command?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
what is the meaning of degreasing of the euipment or line.
Distinguation between Developing Length and Lapping Lengh
Plz tell me...column and wall section drawing.
What are the different methods for drawing an arc?