Answer / rajarshi basu
Keeping the casting of piling in mind on site,it would be
foolish to answer this kind of question as the concrete used
for casting is RMC where we dont get to know the proportions
of mixes the mix designer has used to design the specified
concrete.
Otherwise it is too simple to calculate from Nominal mix design
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / ameen chouhan
The ratio 1:1 is micro piles and 22bags per cum
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / s.r.shiradhonkar
vol of pile is 0.63 cum
Material required
Metal (0.80 cum/cum of concrete)i.e 0.8*0.61=0.488 cum
Sand (0.40 cum/cum of concrete) i.e 0.4*0.61=0.244 cum
cement(0.40 cum/ per cum), (as cement sand ration mentioned
1:1). cement required= 0.4*.0.61=.244 cum. 1bag of 50 kg
have volume 0.035 cum. there for bags required=0.244/.035=
7 bags.
S.R. Shiradhonkar
Amarawati.
| Is This Answer Correct ? | 6 Yes | 7 No |
Answer / dushyant bansal
For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.
| Is This Answer Correct ? | 0 Yes | 2 No |
Answer / sjtbehera
8. Volume of pile -.61m³
If you given cum your ratio is 1:1:2 not 1:1
Total ratio=1+1+2 = 4 so cement = .61/4=.1525m³= 4bags
Sand=.1525cum
Agg.=.1525*2=.305m³
| Is This Answer Correct ? | 5 Yes | 20 No |
List out the types of roofs?
Which stone is best for wall construction Laterite Stone or Cement Blocks
Define Chimney in Thermal power plant?
WHAT IS THE UDL OF TOWER CRANE?
standered size of toilet & bath?also stair-case?
In a given rcc design, how to calculate quantity of steel, for all practical purpose of construction?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what is tacheometry?
difference between specification and method of statement
How can I make justification between using concrete grade c35 compare c37?
what is the advantage of electronic theodolite over transit theodolite?
How to calculate the cement plastering for circular and rectangular water storage tanks and how to calculate the area of circular and rectangular floor?? Please help me
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)