How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answer Posted / s.r.shiradhonkar
vol of pile is 0.63 cum
Material required
Metal (0.80 cum/cum of concrete)i.e 0.8*0.61=0.488 cum
Sand (0.40 cum/cum of concrete) i.e 0.4*0.61=0.244 cum
cement(0.40 cum/ per cum), (as cement sand ration mentioned
1:1). cement required= 0.4*.0.61=.244 cum. 1bag of 50 kg
have volume 0.035 cum. there for bags required=0.244/.035=
7 bags.
S.R. Shiradhonkar
Amarawati.
Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
Under what circumstances should pot bearings be used instead of elastomeric bearings?
what is the clear cover for shearwall?
Describe the advantages and disadvantages of using plastic and timber fenders?
How is make concrete cube?
explain the rale of the government in the construction industry
What is the difference between one-way slab and two-way slab?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
please briefly explain calculating or estimating steel quantity for a RCC column?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Define a polyline?
how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is the Asfalt test?in road constraction..?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.