How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answer Posted / s.r.shiradhonkar
vol of pile is 0.63 cum
Material required
Metal (0.80 cum/cum of concrete)i.e 0.8*0.61=0.488 cum
Sand (0.40 cum/cum of concrete) i.e 0.4*0.61=0.244 cum
cement(0.40 cum/ per cum), (as cement sand ration mentioned
1:1). cement required= 0.4*.0.61=.244 cum. 1bag of 50 kg
have volume 0.035 cum. there for bags required=0.244/.035=
7 bags.
S.R. Shiradhonkar
Amarawati.
Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
Trapezoidal section footing calculation of Volume & its Area
how to calculate the steel in 500yard
How much quantity of cement,sand,stone used to build 1 cum of cc road??
How to do rate analysis for concrete work including shuttering work?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
what else we can add rather than admixture in concrete to reduce the cement quantity?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
What is the difference between undo & redo?
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
What is the purpose of the gap in the road on this bridge?
What is the basic difference between OPC
Critical Path Method is...
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?