How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answer Posted / s.r.shiradhonkar
vol of pile is 0.63 cum
Material required
Metal (0.80 cum/cum of concrete)i.e 0.8*0.61=0.488 cum
Sand (0.40 cum/cum of concrete) i.e 0.4*0.61=0.244 cum
cement(0.40 cum/ per cum), (as cement sand ration mentioned
1:1). cement required= 0.4*.0.61=.244 cum. 1bag of 50 kg
have volume 0.035 cum. there for bags required=0.244/.035=
7 bags.
S.R. Shiradhonkar
Amarawati.
| Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
What is the exception critarea of cube?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
what is your role of in previous company as a construction manager
What quantity of 1.0 m3 bricks required?
How many lbs are there in a yard?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
In case if concrete box girder bridges how is the number of cells determined?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
Define What is an ice dam sock?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
explain the advantages of total stasion
What is the biggest dam in america?