How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answer Posted / s.r.shiradhonkar
vol of pile is 0.63 cum
Material required
Metal (0.80 cum/cum of concrete)i.e 0.8*0.61=0.488 cum
Sand (0.40 cum/cum of concrete) i.e 0.4*0.61=0.244 cum
cement(0.40 cum/ per cum), (as cement sand ration mentioned
1:1). cement required= 0.4*.0.61=.244 cum. 1bag of 50 kg
have volume 0.035 cum. there for bags required=0.244/.035=
7 bags.
S.R. Shiradhonkar
Amarawati.
| Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
What Are The Different Type Of Slump Test Indications?
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
Explain what is Hybrid Foundation?
What glue is least sticky?
What are the problems one might face while having a Cantilever balcony?
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
What are the different types of foundation?
Minimum concrete cover in slabs, columns, beams, foundation and other st?
what is meant by residual strain?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
how much cost of single coat 20mm thick plastering per sqre meter
Why Vitrified tile are getting pop up.