How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3

Answer Posted / dushyant bansal

For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what does the grad of cement shows (denotes)?

1145


Please design 12.5m long dubbly beam

1472


What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers

1840


what is differences between ferrock and concrete ?

1424


SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING WORK?

2243






Explain why concrete barriers have curved surface profiles?

819


how to calculate the concrete mix m30 by volume

1091


what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.

1875


Can we apply curing compound on ceiling (slab Bottom)

359


how to estimate material requirement for an area of house in square feet?

1733


How many Sft of Level Plaster per Kg

1121


03. a. The water cement ratio for achieving maximum strength of concrete is…… 1 b. Water/ cement is inversely proportional to-------------- 1 c. Increasing the slump decreases the strength: True / false 1

1724


What in your past experience or education prepares you for the position for which you are applying

1697


What does civil engineering mean?

648


What is the likely strength of a 1:2:4 concrete mix?

668