How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answer Posted / dushyant bansal
For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
What is the likely strength of a 1:2:4 concrete mix?
What are the uses of groynes?
pile load testing procedure
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
What are wooden shingles?
may i know the detailed description of cutting length
How much area will be covered in 1 litre of Velvet touch paint in normal wall condition
How to decide/consider the grade of bitumen for dbm.
Why are pull-out tests performed for soil nails?
Define What is passive earth pressure ?
How do you measure water flowing through 300mm diameter pipes?
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
What is difference between code and standard and specification?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building