How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3
Answer Posted / dushyant bansal
For 1:1 Cement sand ratio
total volume of either will be same as the ratio will be
1:1
and Sand will cover about 80% volume hence 0.8*0.61=
0.488cum
and same vol of cement.
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
what is the price of a cubic meter of concrete on international market?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
What is Base Shear ?
How is the strength of cement measured?
Define polar co ordinates.
which red: used in roof teping, then use only cement
Basic civil interview questions
What is the cost difference between site mix and ready mix concrete per cubic meter
material used for mendrel use to bend epoxy coated rebar
For the construction project what capital cost has to be taken in consideration?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC