what is the sequence of the activities in the typical under
ground water tank including civil & MEP works.
No Answer is Posted For this Question
Be the First to Post Answer
please know me that required quantity of cement , sand , water and bricks for 1 cub meter of brick work
A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?
clean earthing and dirty earthing
1 Answers CSCEC-China State Construction Engineering Corporation,
How many steel is require in one sqft area?
17 Answers L&T, XYZ,
how to take quantity in triangle section for calculating tender purpose
how to check aggregate quantity in stock yard
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
how can we design dia of rainwater pipes ? plez explain by using formula ?
What is difference between target mean strength and compression strength of concrete?
In what construction is concrete grade m35 used?
4 Answers Cipla, High Concrete,
what type of qustions can i expect from soil mechanics
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)