How much quantity of Cement and Sand required for Cement
Sand Ratio of 1:1 and volume of pile is 0.61 m3

Answer Posted / rajarshi basu

Keeping the casting of piling in mind on site,it would be
foolish to answer this kind of question as the concrete used
for casting is RMC where we dont get to know the proportions
of mixes the mix designer has used to design the specified
concrete.

Otherwise it is too simple to calculate from Nominal mix design

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

1668


Dear Sir What is the Contraction joint for base Slab

1651


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

1890


How to determine spacing of bars in slabs or beams

1969


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

1261






how to calculate the chair reinforcement length in slabs, footing or anywhere??

1878


WHAT IS YOUR CURRENT SALARY

1669


what is moment-curvature relationship in semi rigid connections??

1656


how can we calculate steel value, depending on load

1738


At what point does a circle start losing area when being flattened?

632


how to calculate freeboard in under ground water tank and technical details

2674


What is passive earth pressure ?

713


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1708


what is diffrence between catchment area,watershed and basin?

2492


what is the clear cover for shearwall?

1060