Answer / shalini.b
Power factor is the cosine of angle between voltage &
current.i.e cos(phi)
or
It is the ratio of Active power to reactive power
cos(phi)=KW/KVA
| Is This Answer Correct ? | 20 Yes | 3 No |
Answer / suhas yeole
it is the ratio of active power to the apperent
power,i.e. cos(Q)=kw/kva
| Is This Answer Correct ? | 14 Yes | 1 No |
Answer / bijay
To Chetan,
Suppose u got 80 out 0f 100 in an exam.
this means u r at a pf of 0.8, the class topper got 95, so
his PF is 0.95.
Now note that KVA is ur total marks(100)
and KW is what u scored.
now its simple pf=kw/kva
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / mehdi
In the above:
cos(phi)=PF= KW/KVA formula is correct.
but KVA is apparent power not reactive power.
KVA= V*I ,
KW=V*I*cos(phi) ,
KVAR= V*I*sin(phi)
KVA=apparent power=Sqrt(KW*KW + KVAR*KVAR)
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / anusree
Efficiency of utilisation of a power supply, higher the pf
better is the efficiency, pf is the ratio of active power
to reactive power
| Is This Answer Correct ? | 1 Yes | 5 No |
hi can any body send me syllabus of rrb electrical section engg... and past pepar also of any board...
what is voltage, and how it makes the electron to move?
what are factors comes under relay setting (distance relay 7sa52) under OPEN DELTA VTs connection??
how was your last weekend.
what is the maximum load sutiable from earth to phase and what is the max voltage earth to phase suitable
FOR 3 PHASE DISTRIBUTION,WHY WE USE ONLY THE VOLTAGE LEVEL OF 440 VOLTS
I want to put this query to SENIOR & EXPERIENCED ELECTRICAL ENGINEERS. 1)I want to know about the control circuit diagrams for control panels. I found it difficult to understand. Is there ant booklet through which we can learn the circuit diagrams? 2)I want to learn about conduiting, laying cables, preparing cable schedules and various techniques which is the part of building infrastucture(construction field). I don't have any experience in this area. I have experience in control panels only. that's why i am not getting any opening in building infrastucture (construction field).Can I get the job in this field as Trainee Engineer? How to enter this field? I need job in PUNE
We have 2 Nos. Transformer with the capacity of 2000KVA and 1250 KVA and currently using only one 2000KVA T/R during operational hours while non- operational hous 1250 KVA T/R also used to reduce T & D losses. Similarly, 2 capacitor bank of 500KVAR and 300 KVAR also installed to balance reactive power. Now problem is around 1000 KW load PF is not maintaning 0.99 as 350 KVAR capacitor is in healty condtion. Now the PF is maintain 0.95 to 0.96.
what will happen if field winding of Synchronous generators given ac supply
What fomula is used to calculate: 1. rated frequency withstand voltage, and 2. rated lightning impulse withstand voltage.
how does we calculate the capacity of battery
If MF is 30000, pt ratio is 110 kV/110 v then what is the ct ratio?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)