Describe the control mechanism of missile launcher???
No Answer is Posted For this Question
Be the First to Post Answer
What is the resistance to be connected for supplying the load of 20mV,1kohm from 20mV supply using rectifier.
I hv a question regarding power factor improvement just after transformer. I request you to reply me plzz. thank you sir. My friend has a small unit of fabrication. in his factory the main load is a welding machine, lathe machine, grinding machine. this load is not continuous type. now our electricity board has installed 16 KVA, 11000/433 V transformer for our factory. In the energy meter (trivector meter) at LV side of transformer, i hv seen power factor value of 0.15 only when only 3 KW load was flowing. Further electricity board has suggested to install 4 KVAR capacitor at LV side after energy meter. Now my question is that if we permanantly install and switch on 4 KVAR capacitor after energy meter, during some load on transformer and also without any load on transformer, wht will be the power factor shown in energy meter?i dont want to get any penalty by electricity board, so plz suggest me if i can permanantly install and switch on the 4 kvar capacitor or not at LV side of transformer just after energy meter? Thank you again and awaiting for ur positive reply soon.
why the transformer primary terminal indicated by u,v,w.to technical reason
Can u Explain about the electronic trivector meter and the use of data converters in them?
Advantages/Disadvantages of earthing of neutral bus on MSB instead of separate neutral earthing for transformer/DG sets feeding to MSB
Why different values of B’s (magnetic flux density) are chosen for DC machines and Induction Motors?
Hi friends I am a service engineer in electrical field i plan to shift design engineer in same field, so i request your suggestion for what software or course i want to learn ?
what is mean by PIR in circuitbreaker and give me detail of that?
How many types of DC current
Why we use the D-curve MCBs in critical power distrubution.
How is The split core current transformer working ?
Why two main buses and one transfer bus scheme not using for 400kV switchyard