Answer Posted / shalini.b
Power factor is the cosine of angle between voltage &
current.i.e cos(phi)
or
It is the ratio of Active power to reactive power
cos(phi)=KW/KVA
| Is This Answer Correct ? | 20 Yes | 3 No |
Post New Answer View All Answers
A 3 phase transformer's (Y-Y) Y and B phase is (Y and B connection not broken) broken from neutral and R and Nutral connection is ok, what will be the relay tripping and why
we have consol make 3 phase servo stabilizer for cnc m/c. while installing the earth neutral voltage is 1.7 volts at stbilizer off condition and when stabilizer get on en voltage reaches 4.8 volts (new earthing is done and neutral is helthy condition all phase to neutral volts 440,442,441 v)why this happen.solution for cause.
show the single line diagram of star delta starter with single phase preventer
How to dimensioning SDCCH, LAPD and CS7 signaling on GSM?
I am shobana from Chennai. I am having my personal interview on 19th Dec at Chennai.kindly mail me the questions to mail id shobana.shanthi@gmail.com
Is there any Institution for giving M-tech in Electrical engineering for those who r in service? Give the details please.
Do closed loop systems require manual input?
what questions are asked in the interview for the post of an electrical maintenance engineer in FMCG companies?
sir i am apearing for nic exam.i dont know exam pattern.can you please send me some model papers
Is it possible to measure correct value of earth resistance & cable insulation ristance with out disconncting earth lead & both sides of cable ends? If not, any other method to measure ER & CIR with out disconneting from the system.
For a 6.6kV Motor it is recommended to do megger test with 500 V d.c and not more than 5kV d.c but the Hi voltage withstand test should be performed by 12kV AC. Why the dc voltage test should be limited but AC voltage withstand test could be with such a high voltage?
Will any motor burn if voltage provided is lesser than the rated voltage???? If yes, then how is speed control possible with voltage control
Define settling time.
we are going to install a solar PV site and how can we calculate PV Solar Panel Efficiency, can anybody tell me complete method for its calculation.