Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the difference between weir and a barrage

Answers were Sorted based on User's Feedback



what is the difference between weir and a barrage..

Answer / manoj

Weirs are typically the uncontrolled structures to raise
the water level behind it. for higher discharges water
flows over the weir.they can be about 6 to 8 m high.
Barrages are the controlled structures through gates. the
pondage area behind barrage is due to the gates and the
breast wall, if provided.The barrages are designed for
higher design flood than the weirs. barrages are now more
useful in hydro power sector.

Is This Answer Correct ?    5 Yes 5 No

what is the difference between weir and a barrage..

Answer / babrak

an imperious berrier which is consteucted across a river to raise the water leval on the up stream side is known weir

while Barrage when adjustable gates are installed over a weir to mantain the water surface at different levals and at different time is called barrage

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is the theoritical percentage of concrete cubes testing per day?

1 Answers   Fresher,


what is the most suitable foundation when construct a bird watching tower in a marshy land

0 Answers  


Mean of m25 concrete

8 Answers   Artech, Dream Careers, KND Engineering, L&T, Trans Concrete,


i have a bar of 36 dia in column, what is the lap length?

12 Answers   RMC,


If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).

3 Answers  


How to determine thee cut length for steel reinforcement bars in R.C.C design

0 Answers  


Briks type

1 Answers  


Did you handle any interior designing jobs?

5 Answers   Shell,


DEFINE M30 GRADE CONCRETE. FROM THIS QUESTION WHAT; "M" & 30?

7 Answers   Descon, Northstar Homes,


what would be the design load of R.C.C Cooling tower per cell.?

0 Answers   CPMT,


what is the clear cover for shearwall?

0 Answers  


What is Gabion Walls?

1 Answers   Rajhans Infracon,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)