DEFINE M30 GRADE CONCRETE. FROM THIS
QUESTION WHAT; "M" & 30?
Answers were Sorted based on User's Feedback
Answer / t.balamurugesan
M is the mix..30 is the strength of the concrete cube after 28 days..
Is This Answer Correct ? | 73 Yes | 3 No |
Answer / manoj kumar bhola
THE WORD M STANDS FOR MIX AND 30 STANDS FOR COMPRESSIVE STRENTH OF CUBE AT 28 DAYS OF CURING EXPRESSED AS N/MM2.
Is This Answer Correct ? | 52 Yes | 5 No |
Answer / mahesh kumar c l
M refers to Mix and the No 30 Refers to the"SPECIFIED 28 Days Cube Strength Of Mix in N/mm2" Cube Size Should be 150*150mm, if it is 100*100 u have to multiply some coefficient.
Is This Answer Correct ? | 20 Yes | 4 No |
Answer / g. anantha rao
M refers to 'Mix' and 30 indicates the 28-days
characterstic compressive strength of standard cube as 30
Newton per sq mm.
Is This Answer Correct ? | 18 Yes | 4 No |
Answer / vivek kumar singh
this is a type of oncreate which having crussing streanth 30N/mm2 at 28 days curing
Is This Answer Correct ? | 11 Yes | 0 No |
Answer / shiva
M is the Standard for Mix and M15 or M20 is the Grade of concrete.
Is This Answer Correct ? | 13 Yes | 7 No |
Answer / sankardas banerjee
M REPRESENT MIX. AND NUMERICAL 30 REPRESENT COMPRESSIVE STRENGH OF CONCRITE OF PER NN2 AFTER 300KG.
Is This Answer Correct ? | 5 Yes | 3 No |
What happens to Load at yielding ?
What is the full form of APVC Pipe?
what is a moisture correction
2 Answers ITC Infotech, Unity Infraprojects,
what is the no. of IS Code?
the bubble tube parallel to the telescope of theodolite should be more sensitive since it controls a. vertical axis b. horizontal axis c. axis of bubble tube d. none of this
what is the difference between volume and weight batching and which is better?
What are the responsibilities of a construction manager?
how can we construct building without foundation providing only grade beam at ground level
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
Wat is the optimum value of tensile strength of concrete after 28 days?
How many steel is require in one cubic meter area?
HOw to find the depth of foundation?