The scaffolding is a temporary structure (usually of timber) having platform raised for the workers as the construction increases in hight.
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / sivaraj
its a tempraory structure that is used for plastering off wall and construct the wall other white washing works..
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / moula
tt a tmporary structure constructed near the struture
usually of aove 1m ht.... pupose of this is to carry the
work above the 1m of the struture nd the wirk like
plastering..white washing..masonry work.. etc
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / sushant s das
It is temporary structure for construction wprk take place
in high altitude where man is unable to work from NGL.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / rajiv ranjan
The scaffolding is a temporary structure having platform raised for the workers as the construction increases in hight.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / amol s. bidwai
its a tempraory structure that is used for plastering to
wall and construct the brick wall
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / mohd hashiruddin
Scaffolding, also called staging, is a temporary structure used to support people and material in the construction or repair of buildings and other structures
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ravitejan
Scaffolding is a temporary structure which will be used like platform for the purpose of curing or plastering or brickwork
Is This Answer Correct ? | 0 Yes | 0 No |
in railway engineering, what are the types of guages? what is its size,length & thickness?
What is the difference between stress and strength?
what will be the quantity of following materials in P.C.C for the total area of (100'x70'x 0'4") 1)NO. OF CEMENT BAGS 2)SAND IN CU.FT 3)METTLE IN CU.FT
0 Answers Pratibha Industries,
What is unit weight of 1st class bricks ?
Describe why concrete must be compacted after it is poured?
States some of the commonly used commands in cad software’s?
bridge design
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
which beam has more strength rectangular or circular
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what type offoundation suitable for clayey type soil