Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


define prestressing? compare prestressing with post
tensioning?

Answers were Sorted based on User's Feedback



define prestressing? compare prestressing with post tensioning?..

Answer / santhoshselvamani

pre stressing means before concrete we was stressing the
cable(tendons)

post tensioning means afterporing the concrete we will
stressing the tentons,

pretension mainly usedfor bridges

post tension mainly used for buildings

Is This Answer Correct ?    14 Yes 6 No

define prestressing? compare prestressing with post tensioning?..

Answer / ashok reddy

Prestressing carried out prior concreting.
Post tensioning carried out once the 7 days cube testing is done.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How is calculate the cube molt

0 Answers   Godway,


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

0 Answers  


Types of pile, which should be prefer in sandy soil

3 Answers  


what is civil enginnering & what you need of this course?

0 Answers   L&T,


how to calculate the quantity of material in 1 cubic meter Concrete?

1 Answers   Sobha Developers,


during site visit if i find voilation going on,what can i do,how i act?

3 Answers  


Why compressive strength of only concrete cubes and cylinders tested ? why not other shapes?

1 Answers  


How to calculate per inch area in a circle?(Dia is 2.17m)

4 Answers  


For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?

0 Answers  


How much quantity a carpenter can do in a day

1 Answers  


why we do multiply 1.54 for dry volume of concrete?

10 Answers   ACC,


silt maximum in sand.

11 Answers   DLF,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)