Answer Posted / ravitejan
Scaffolding is a temporary structure which will be used like platform for the purpose of curing or plastering or brickwork
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to decide/consider the grade of bitumen for dbm.
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
How to build the floor to ceiling bookcase?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
The mixture of different ingredients of cement is burnt at?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
what are the five benefits of using standard terminology in the measurement process?
How to calculate brick work quantity?? Block work quantity??
it is a corrected question." make a list of engineering property(properties) of soil.
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
How do you measure water flowing through 300mm diameter pipes?
Trapezoidal section footing calculation of Volume & its Area
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.