tt a tmporary structure constructed near the struture
usually of aove 1m ht.... pupose of this is to carry the
work above the 1m of the struture nd the wirk like
plastering..white washing..masonry work.. etc
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Who built the sears tower?
What are the causes of building collapse?
How do you compute volume of airflow?
how to determine H- zone in a column? where it will occur?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Differentiate orthographic and isometric projections?
how to calculate rate analysys of 1:6 plastering 10 sq m
How to plan a project
What is the minimum size of the particles of silt soil?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what is right & short method of measurement of slab&beam
dialation means