is it fair to recruit another prestressing agency once
earlier agency has provided guide cone for post stressing
the Concrete -I girders? It is observed that the bearing
plate of another agency is not matching with the earlier one
resulting in protruded strands after stressing from the face
of girder. Kindly advice.
No Answer is Posted For this Question
Be the First to Post Answer
What is a Quick Sand?
what is the strength [final]of grade m 15 to m 45
what happens when the curing is not done properly for structures ??
what is the difference between the splice & Lap length.
what is the cement mortor thickness for 23 cm brick work and 11.5 brickwork?
What is missing report and how to prepare
what would be compressive strength of cube for 7 days if design mix of M15
can we go for short rcc column without any steel rienfocement carrying truely axial load only???(No other load acting on it such as wind load,earthquake & lateral earth pressure)
What is the differential length of steel reinforcement? What is the over lap length of steel in different grades of concrete?
What is differences between torsion and buckling?
from where ican get sample papers for CET-delhi 2012
define curing? what is the necessity of curing?