How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow?
sand=Rs.500/mt
Brick=Rs.5/brick
Labour=Rs 300/day
Free issue=cement+water+electicity.
Answers were Sorted based on User's Feedback
Answer / p.ayyanar
for example 20m length and 5m height.nominal volume 20*.3*5=30
normally motor joint 1cm
Therefore actual volume =20*.29*5=29
standard brick size 20*10*10.NOMINAL SIZE=(29\.20*.10*.10)=14500NOS
no.of bricks per cu m=14500\30=484
5%wastage
so 10 cu m 5000bricks available
Is This Answer Correct ? | 7 Yes | 3 No |
Answer / dipak d patel
1 Bricks no. 5000.00 005.00 25,000.00
2 Sand cum 2.64 706.00 1,865.72
3 Cement Bag 15.60 000.00 3,120.00
4 Labour Day 16.00 500.00 8,000.00
5 Mason Day 07.00 500.00 3,500.00
6 cont profit, OH to be considered as per your
regualations. Normally 15% to be considered for the same.
Total Rate for 10 cum without contractor's profit is
41,485.72 Rs/10cum.
Is This Answer Correct ? | 2 Yes | 3 No |
What is the biggest dam in america?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
how the lap length is calculated in reinforcement of 110mm dia steel of Length 15.00 mtrs. & grade of concrete is M20
how to calculate estimation for puttey... give me an example
Why should appointment store person for project ? what is the benefits for company ?
where does the hinged action while designing the strture
What is the per cu. mt. price of ready mix in Gujarat region.?
how much to get of BRC lapping in full yield and half yield ?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What are the advantages of building a dam on the river nile?
what is the difference between arch dam and gravity dam. Name a gravity dam in India
6 Answers AAI Airports Authority Of India, L&T,