How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow?
sand=Rs.500/mt
Brick=Rs.5/brick
Labour=Rs 300/day
Free issue=cement+water+electicity.

Answers were Sorted based on User's Feedback



How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow? sand=Rs.50..

Answer / p.ayyanar

for example 20m length and 5m height.nominal volume 20*.3*5=30
normally motor joint 1cm
Therefore actual volume =20*.29*5=29
standard brick size 20*10*10.NOMINAL SIZE=(29\.20*.10*.10)=14500NOS
no.of bricks per cu m=14500\30=484
5%wastage
so 10 cu m 5000bricks available

Is This Answer Correct ?    7 Yes 3 No

How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow? sand=Rs.50..

Answer / dipak d patel

1 Bricks no. 5000.00 005.00 25,000.00
2 Sand cum 2.64 706.00 1,865.72
3 Cement Bag 15.60 000.00 3,120.00
4 Labour Day 16.00 500.00 8,000.00
5 Mason Day 07.00 500.00 3,500.00
6 cont profit, OH to be considered as per your
regualations. Normally 15% to be considered for the same.

Total Rate for 10 cum without contractor's profit is
41,485.72 Rs/10cum.

Is This Answer Correct ?    2 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

What is the biggest dam in america?

0 Answers  


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

0 Answers  


Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938

2 Answers   ADP,


how the lap length is calculated in reinforcement of 110mm dia steel of Length 15.00 mtrs. & grade of concrete is M20

22 Answers   L&T,


how to calculate estimation for puttey... give me an example

1 Answers  






Why should appointment store person for project ? what is the benefits for company ?

0 Answers  


where does the hinged action while designing the strture

2 Answers   DLF,


What is the per cu. mt. price of ready mix in Gujarat region.?

0 Answers   Neptune,


how much to get of BRC lapping in full yield and half yield ?

0 Answers   Engtex,


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

0 Answers   Government, L&T,


What are the advantages of building a dam on the river nile?

0 Answers  


what is the difference between arch dam and gravity dam. Name a gravity dam in India

6 Answers   AAI Airports Authority Of India, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)