Answer Posted / sushant s das
It is temporary structure for construction wprk take place
in high altitude where man is unable to work from NGL.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
what is floating slab foundation?
what is parametre for M25 after 7 days strength
what is the breaking strength of wall tiles
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
.5Ast
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
What is the meaning of a blue land surveyors flag?
Define What materials were used to build the Golden Gate Bridge?
psc girder detail
How cracks in concrete can be avoided?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
at what pressure ply-wood is obtained by gluing wooden sheets
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
Which ratio use for cement selery???
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.