Answer / shamshad ansari
First stage fault only alarm and second stage trip the generator.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / shamshad
First stage only alarm and second stage trip the generator.
Is This Answer Correct ? | 0 Yes | 0 No |
Hi friend i m glad dat u came up with a question like dat .
i appreciate ur indepth study of power system .
well basically the rotor system of altenators are unearthed
due to which the single gound fault at the rotor doesnt
actually disturbs the rotor as there is no fault current ,
however if a second gorund to earth faukt develops then the
short circuit between the windings results as the fault
current gets a path to flow . the former is called the 1st
stage fault while the latter is called the 2nd stage fault.
Is This Answer Correct ? | 0 Yes | 1 No |
in most industies hormonics present up to some level. what is limit ? and there effect?
HOW WOULD YOU PRESENT THE POWER FACTOR PRACTICALLY ON A GRAPH
what is the reason of capacitor failure in alternator which is working with 10 kva dgset
what ever the ups kva it may 500 kva or 500 va always out put is AC 240 volts its right?
What do you mean by a voltage transformer?
Difference between induction motor and synchronous motor? i Think Synchronous motors operate at synchronous speed (RPM=120f/p) while induction motors operate at less than synchronous speed (RPM=120f/p – slip). Slip is nearly zero at zero load torque and increases as load torque increases am a right pls guide & send Other Comments
In case of delta/delta transformer if the one phase is blown out then what will be secondary line voltage ?
what is d main difference between KVA and KWA
What is the source of dependent source ?
in 220/132 substation in place of PT what equipment used & what r the role of that equipment
why is the size of earth conductor is half of phase conductor.
1 Answers Century Pulp and Paper, L&T,
Brief me about maintenance planning & sheduling of machine tool.