wat is the difference between rotor 1st stage fault and 2nd
stage fault?
Answer Posted / shamshad ansari
First stage fault only alarm and second stage trip the generator.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
When calculating the speed of a rotor required for a particular frequency of synchronous generator we use the equation 60f/p Is this p is the number of pole pairs of rotor & do we consider the number of pole pairs in the stator is 1?
hello friends..... any one have papers or any study materials?sail ,hpcl...?
my UPS suddenly goes off and all panel light also blow off.This happens even main electric supply is not interrupted.After some time it automatically starts functioning normally.Batteries are new.
WHICH SIZE A.B.CABLE IS USED FOR 11KV.
How two nos. 130 kw D.C motor get synchronise using D.C drive.
what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?
Why the output of OP-AMP is always less than Vcc?
How many double suspension hardware fittings are required on a double circuit transmission tower?
why voltage form factor of PT are increase , when it is ecpected heigher spikes in system. how it is calculated.
Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???
Consider three heater bank connected in 3 phase star with neutral.Each heater bank connected in each phase.So each phase get 230 volts supply.my question is,during balance condition, current flow in neutral or Not
My load is 1635 KW. & current pf is 0.884, I have to improve it for 0.99.Please suggest what KVAR value is needed?
how to select electrical equipment such as fuse,dg,transformer,motor,msb,wire,cable as per the connecting load..please mention any books to design,take licence
I have a reading off 1.5ohms at my mem my main c/b is rated at 40/6 amps in a domestic house and i was told to change it to a b curve c/b is this ok
how can we make cable shedule for controll wiring ? which details must be required for it.?