ELIGIBILITY
1.FIRST IF YOU APPLY TO C- LICENSE NEED WORKING MAITENACE
EXPERIENCE FOR ABOVE 500KVA TRANSFORMER SUPPLY FOR TWO YEARS .
OR
2.YOU SHOULD BE WORK IN HT AND LT UNDER A-GRADE CONTRACT
LISENCE HOLDER FOR TWO YEARS.WHEN JOINING TIME YOU SHOULD
INFORME THROUGH THIS CONTRACT PERSON TO LISENCE OFFICE.
APPLYING PROCEDURE
FIRST WE GO TO C-LICENSE OFFICE AT GUINDY (CHENNAI) THEN YOU
RECEIVED APPLICATION FROM THERE OR YOU TAKE PRINT OUT FROM
ONLINE FROM THIS WEB ADDRESS www.tnelb.gov.in.
1.APPLICATION SHOULD TO BE FILL.
2.DIPLOMA CERTIFICAT ORIGINAL
3.NATIONAL SAVING CERTIFICATE FROM RECEIVE POST OFFICE BASED
ON YOUR APPLICATION PROCEDURE.
4.DD-AS PER APPLICATION PROCEDURE AMOUNT
5.MODEL SIGNATURE IN WHITE PAPER- 2 SIGN
6.PASS PORT SIZE PHOTOS
THEN YOU APPLY
| Is This Answer Correct ? | 413 Yes | 40 No |
Answer / p vinoth kumar
please kindly look into this url :
www.tnelb.gov.in
| Is This Answer Correct ? | 83 Yes | 16 No |
Answer / v.prasanna
hi sir
iam working in pvt cocern as want apply c licences
regards and thanks
| Is This Answer Correct ? | 68 Yes | 10 No |
Answer / sakthi prakash
Iam completed DEEE. Also now doing BE. iam connot experience
person. then how i got c-license?
| Is This Answer Correct ? | 80 Yes | 34 No |
Answer / pvsaravanan
how can get electrical "c" licence.i am complited in
DEEE.PASSING YEAR OF 2004.WORKING IN PVT COCERN LT
LINE.PLEASE ADVISE ME .CELL NO 8056011415
| Is This Answer Correct ? | 69 Yes | 24 No |
Answer / r.ponsekar
I HAVE COMPLETED IN DEEE IHAVE PASSING YEAR -2004,I HAVE
APPLAY FOR THE ELEC :C" LICENCE
| Is This Answer Correct ? | 57 Yes | 17 No |
Answer / antonyraja.s
1)You have to get the 2years service certificate from the
company
2)3Nos Passport size photo
3) 3times specimen signature in a separate sheet
4) Diploma original certificate
5) License fee Rs300/DD (revised) infavour of Electrical
licensing board,Ihiru vi ka industrial estate,Guindy
above these along with registered post please send it.
| Is This Answer Correct ? | 45 Yes | 16 No |
WHY SPEAKER OUTPUT IN WATTS??
why do we use LPF wattmeter not UPF in the experiment of no load and blocked rotor test of 3phase slipring induction motor?
What is different between Difnit time and instatous over current relay
Which device is provided as backup of Buchholz relay???
i want to trigger ATS (Mains +Generator )from external system could any body help me in this regard ?? is it posible if yes please tell me how?
What is called limb of a transformer?
Please give me a solid reason there are 2 ELCB's If we take Phase from ELCB NO:1 an Netural from ELCB N:2 why ELCB is tripping when we connect the Load?please brief me with detail
why name plate detail HP/KW rating of a motor is different from measured value HP/KW using formula?
galloping in transmission line is due to
We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.
What is the diffrece between ACB & MCCB
What difference between voltage and current
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)