How can get electrical "c" licence.I am complited in
Deee.Passing year of 1993.Working in pvt cocern lt
Line.Please advise me .Cell no 9994786021

Answers were Sorted based on User's Feedback



How can get electrical "c" licence.I am complited in Deee.Passing year of 1993.Working in..

Answer / umapathy

In s-Form Gazzert Officer Signature is very compulsory or not please given answer for me

Is This Answer Correct ?    0 Yes 0 No

How can get electrical "c" licence.I am complited in Deee.Passing year of 1993.Working in..

Answer / siva

i am deee passout 2011 2.5year experience transformer service iam second class eligible are not eligible to c license?

Is This Answer Correct ?    0 Yes 0 No

How can get electrical "c" licence.I am complited in Deee.Passing year of 1993.Working in..

Answer / kk

i have working in complete in 6 years experience so how to c licence procedure

Is This Answer Correct ?    0 Yes 1 No

How can get electrical "c" licence.I am complited in Deee.Passing year of 1993.Working in..

Answer / sathyakumar

I diploma complete 2012..but arear clear in 2015 I can ealigible in c licene ..I am working 2years in a grade contractor..

Is This Answer Correct ?    0 Yes 1 No

How can get electrical "c" licence.I am complited in Deee.Passing year of 1993.Working in..

Answer / kathir

hai friends i had completed DECE 2012 i'm experienced in LTHT maintenance field. is i'm eligible for apply C" license..
explained me friend
thankyou..

Is This Answer Correct ?    0 Yes 1 No

How can get electrical "c" licence.I am complited in Deee.Passing year of 1993.Working in..

Answer / prabhakaran

how can get electrical "c" licence.i am complited in BE ECE? Is possible to get ??????????? please tel me ..

Is This Answer Correct ?    0 Yes 2 No

How can get electrical "c" licence.I am complited in Deee.Passing year of 1993.Working in..

Answer / arun

hello sir,
Im searching internet in Tamil Nadu electrical license board, i got the some detail but lot of confusion as well as lot of forms like form WH,form W,form S,form P,form H to B, form B to C,form EB,form SB,form A and form SA.which form i want to fill and apply for electrical C license?
pls sir ans tell me..88706 29102

Is This Answer Correct ?    1 Yes 3 No

How can get electrical "c" licence.I am complited in Deee.Passing year of 1993.Working in..

Answer / jaga

Hi have combeleted BE and tneb apprentice so i am eligible for c license

Is This Answer Correct ?    0 Yes 3 No

How can get electrical "c" licence.I am complited in Deee.Passing year of 1993.Working in..

Answer / ankush miglani

collect the form from karmpura delhi. fill the form ,
interview will be done at table on sport

Is This Answer Correct ?    63 Yes 68 No

Post New Answer

More Electrical Engineering Interview Questions

why wound rotor is star-connected?

4 Answers  


i am swathi, b.tech 4th year. In smps(switched mode power supply)we are using diodes,mosfets,igbts for controling of current. And my question is why we did not use thyristors(scr)? it is also act as a switch,then what is the drawback of scr as compared to above transisters> if we use the scr,then what is happening ? plz give reply as soon as possible bcoz i am doing project on smps. plz frnds i want ans for that. if anybody know the ans plz send to my e-mail id /swathi.tadakapally@gmail.com/

5 Answers   EEE, TCS,


1.Is there any difference between terminologies,HT-HV &LT- LV? 2.What is the highest transmission voltage level in india?

5 Answers  


WHAT IS SPEC OF CLEANROOM MOTOR AND LIGHT FITTINGS?

0 Answers   Apotex, JLL,


can alternators work at leading power factor?

2 Answers  






why 30kva ups buzzing(hamming) sound?

2 Answers   Madhya Pradesh Electricity Board MPEB,


what is ballast

1 Answers  


how to know the diffrential relay setting of 06mva step- down (delta-star)transformer?

0 Answers   IPCL,


How we can determine short circuiting current any plant and for example a plant which power generation is 415 volts and plant load is 500 kw.

0 Answers  


An input device is interfaced with Intel 8085A microprocessor as memory mapped I/O.The address of the device is 2500H.In order to input data from the device to accumulator,the sequence of instruction will be

1 Answers   GATE,


how to control the generator output voltage? what r the condition should satisfy for synchronization?

7 Answers   HP,


why free wheeling diode is connected across inductive load

16 Answers   NTPC, Omaxe, Wipro,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)