Shall we have to restart sap system after configuration of
operation modes?
Answers were Sorted based on User's Feedback
Answer / satya
No. There is no need to restart sap system after
configuration of operation modes the t-codes used for
operation modes are
RZ04, SM63, RZ03.
Is This Answer Correct ? | 35 Yes | 0 No |
after changing some parameters in rz10 and restart,the system doesn't start up?what to do?
How do u Monitor and Troubleshoot client copy in SAP?
how many max application server we created in company. last limitation pls tell me in figure?
What is the importance of early watch client?
Hi All I am Vamshi I Provide Training on ECC Security, Bi Security, HR Security, GRC Access Control Suit(RAR SPM CUP ERM), SRM Security and CRM Security. Duration: 30 days Fees: Rs 7000/- Vamshi Krishna +91-7569362152 email: s.sap30@gmail.com
friends ..... i hava a question, i have to assign sm36,3m37,su01 has to assign to a user with only options (display ,create).how can ia assign this to user? need quick reply......
what is the use of psaptemp table space?if we delete all the data files in temporary table space will oracle throws any error?
while using jspm /sdm the user is locked.what will you do?
Which table contains the details related to Q defined in SPAM? Is there a way to revert back the Q defined? If yes, How?
1)Have you used performance tuning? What major steps will you use for these? 2)In production what is the user exit? 3)What type of user exits have you written? 4)Difference between Search Helps and Match Codes 5)On which even we can validate the input fields in module progams? 6)what are the table controls in BDC ? 7)what is the difference between bdc and lsmw ? 8) If the scripts are client dependent, what above driver program ? (client dependent / independent) 9). I have two pages, In one page I want address, Header, Main & footer. In the second page I want only Main. How to do it? 10) Will 50,000 records be uploaded directly into APP's Server? 11) What is the button to change the variant in ALV ? 12) If your project is support project ? when is your implementation has completed ? 13)In start of selection, if we perform validation, what happens ? 12)How to join 3 tallies & looping. We have developed a program in a client say (200- client) and 210 has test data. No developing rights. How to test data? 13)How to transfer data which is coming from are report as output to another report 14)How to create standard text and how do u transfer it ? 15)What are the views when we are creating Material ?
In what sequence does a dialog work process allocate the different memory areas (according to SAP recommendations)?
I've performed table space adjustment while doing a client copy in production system.do i need to do that table space adjustment in my disaster recovery system as well?