If a background job runs more than the time it should be
completed normally then what action will u take ?
Plz Post the Answer
Answers were Sorted based on User's Feedback
Answer / ravi m
1. Check the system (if u have any dedicated application
server for background jobs check the particular application
server Status and response time and os logs) response time.
2. If there is no enough background process to execute that
background job increases the background process if u have
enough background process then check the network speed and
network response
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / chinna
First of all check whether the job has ran previously ,
check the history of that job. If it is taking more time
than the previous try checking the background work
processes, check the load and generation time, check the
buffers and increase it accordingly.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / s.m.feroz ahmed
Hi,
If a Background job runs more than expected time then one
should cancel job by making use of T Code "SMX" and can
schedule job at different interval of time.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / s.m.feroz ahmed
Hi,
If the back ground is running more than the time it should
be completed then one should make use of TCode "SMX" and
should cancel instance and can schedule the job at
different instance.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / shilpa
the reason for ths is its quote possible that the resource
is not free or the sever is going through more work load.
it is quite possible that if for example a same table been
read out simultanuesly.
regards
SHilpa
Is This Answer Correct ? | 3 Yes | 5 No |
Difference between SAPNote and Support package?
what is role of sap administrator in pi & ep?
Where the patches are installed (CI or DI or both)?
How to change default password of EARLY WATCH STEP BY STEP
Tell some profile parameter that you have maintained?
What is "Hit Ratio"?
how to know the port number of message server?
What is role and what is profile? Different between both?
what is the difference between system copy and system refresh?
What is redolog file? Path?
How to perform the transport?
what is diff b/n sm50 and sm66 with explanations and screenshots