If a background job runs more than the time it should be
completed normally then what action will u take ?
Plz Post the Answer
Answer Posted / ravi m
1. Check the system (if u have any dedicated application
server for background jobs check the particular application
server Status and response time and os logs) response time.
2. If there is no enough background process to execute that
background job increases the background process if u have
enough background process then check the network speed and
network response
Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
When we are doing cash sales, free goods and discount, How many pricing procedure do we need to create..? Only one PP required or have to create multiple PP..? and how many condition type we need to create..?
I also wanna work with Webdynpros? What are the requirements? I mean SAP 4.7 ee or ECC 5 or 6? Netweaver developer Studio? Also with win 2003 i have the activation problem every month. SO do i get a cd that doesnt ask for the activation? i have win 2000 but can it be installed on HP pavilion laptops that are coming preinstalled with Vista OS?
What settings we have to do in EEWC while using slandalone SAP-CRM system.
Transport request types and its syntax?
How to uncar car/sar files in a single shot?
What is business kpis ?
Do? If another user wants to share that lock but the user using that
How to perform the transport?
Explain what are the functional modules used in sequence in bdc?
What are the different types of job status? Can you unschedule an active job?
Explain what is the purpose of tdevc ?
How you connect ECC to EP?
What is the use of profile paramater ztta/roll_area?
What is development class? Why to create the development class?
I am installing a sap j2ee engine at crm. When it reaches phase 22 it halts for more than 10 minutes and gives up starting the system. What should I do?