If a background job runs more than the time it should be
completed normally then what action will u take ?
Plz Post the Answer
Answer Posted / shilpa
the reason for ths is its quote possible that the resource
is not free or the sever is going through more work load.
it is quite possible that if for example a same table been
read out simultanuesly.
regards
SHilpa
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
How to create RFC CONNECTION between production server and Global trade system. what prerequsite we need for this.
What are the errors you got while applying support pack?
what is the difference between with core
What is a support package?
How can you find the list of objects that have been repaired in the system?
What is osp$ mean?
Explain how you can restrict multiple logins of user in sap? What are the thing you have to take care of while writing the id’s?
What are the key responsibilities of sap basis administrator?
How to deactivate IPC in standalone CRM.
Which table contains the details related to Q defined in SPAM? Is there a way to revert back the Q defined? If yes, How?
Is there a difference between user ddic and sap_all/sap_new?
What is the folder it will ask to install oracle?
How can a user be able to access only for Customizing requests even if assigned se01 and se10?.
What is transport layer and domain controller? In which system you have create domain control?
What is the purpose of table tadir?