what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
No Answer is Posted For this Question
Be the First to Post Answer
How much qty. of cement used for laying 1 Sq.Meter of tiles(600mmx600mm)
i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula
what is M & 20 of M20 concrete
11 Answers Bharti, Sheladia Associates, URC Construction,
Explain what are the phases inspections are done by local authority while construction?
In block work seawalls what is the purpose of slip joints?
What is the benefit of making a cantiliver proped.?
7 Answers CCCL, Engineers India Limited,
what is the formula for lapping length
what compressive strength of bricks?
what is procedure to find the volume of material in M20 concrete?
what will be the quantity of matterial and water for pcc in 1 cubic meter , the ratio is 1:4:8 (cement:sand:aggr) ?
What is the difference between dumpy level and auto level.
What is binding spacing of the rebars at lapping zones.