Number of cement bags required for concreting 1000 square
Feet slab of 4 inch thickness.
Answers were Sorted based on User's Feedback
Answer / mohammedazhar uddin
for the grade m20 the cement per 1cum is 320kg
so the quantity is calculate in this manner
1000*4"=9.42 cum
then 9.42*320=3014kg 1bag= 50kg than
3014/50=60.2bags
Is This Answer Correct ? | 87 Yes | 35 No |
Answer / raghav gowda
for 1000sqft slab of 4" thk.
assume for M20 grade of 350kg cement for 1cum of concrete is
first convert the 4" thk to feet i,e 4/12= 0.333'
then, 1000x0.333= 333cft
convert 333cft to cmt i e, 333/35.28=9.438
for 9.438cmt of concrete cement required is 9.438x350=3303.3kg
then convert it in to bags
3303.3/50=66.066bags
so the cement reqired is 66.066bags.
Is This Answer Correct ? | 67 Yes | 27 No |
Answer / ashwini
If the grade of concrete is M25 and 330 KG cement per cubic
meter of concrete. Then the answer is 61.31 bags of cement
is required.
Is This Answer Correct ? | 39 Yes | 26 No |
Answer / dharmendra barot
For 1000 sq ft 4"thick use M20 (1:1.5:3) for cement required 71 bags
Is This Answer Correct ? | 26 Yes | 14 No |
Answer / somu
1000 Sq.ft= 92.9 Sqm
4 inches= 0.1 m
volume= 92.9*0.1= 9.29 Cum
M20 Grade
Cements bags= 0.29*(0.46/1.5)*1440=4102.464kgs/50 kgs= 82 Bags
Is This Answer Correct ? | 13 Yes | 6 No |
Answer / sindhu
If grade is M10 (1:3:6), cement in kgs per cum is 266kgs
1000 sq ft
4 inches=4/12=0.33ft
1000*0.33=330 cft
330/35.315(1 cum= 35.315 cft) = 9.344cum
9.344*226(cement in kgs per cum) =2111.85 kgs
2111.85/50(per bag) = 42.23 bags
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / remesh babu pillai .k .p
Theoretically -61.3 bags .practically it comes 55.8 Bags
Is This Answer Correct ? | 0 Yes | 2 No |
I need to constructive work in amaraj batteries
how to calculate the stirrup bend length?is there any formula?
what is the wait of cement in different concrete mixes from M15 TO M50
Types of Water Proofing Material?
How much cement and water required for cement selery????
1.what is the main responsibilites of Site Engineer ? and what are main attitude ?
what are the stress act on circular slab?
difference between high rise & multistoried building?
why does only water ads in concrete?
What is the method of soil replacement test?
How to make tiles floor step by step procedure?
What should be the Slump(Min.)in cement in concrete in all grades of concrete?