1. why we use inverted beam ?
2.why we use extra bar in beam ?
3.dimension in L-bar in column ,footing and beam
Answers were Sorted based on User's Feedback
Answer / sha
L bar means devolopment length...normally it is 46d(diamtr
of bar)
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / umesh gumme
We use inverted beam in that moment the distanjce b/w ceiling and flooring comes less...
| Is This Answer Correct ? | 2 Yes | 1 No |
what is right time of slab DE shattering and beam boo tam.
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
Is there any relation between grade of concrete and Steel
Dear Friends am S.PRABHU looking for job chnage i have wonderfull exposure to both Construction works & i have a experience 11 years if any found any suitable opening, please Contact 9986539249
how to calculate cement coefficient for 20mm thick vitrified tiles flooring with cm 1:4 with explaination
lap lenth
deshuttering time for RCC for DPC over the foundation.
Why the statue of liberty is made of copper?
what shape of coarse aggregates are ideal for concreting?
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
width rangs in NH,SH in one-way lane &two-way lane why we are provid caber is there any reson for that
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
0 Answers GKC Projects Limited GKCPL,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)