what is differnce between Tomanufactring leadtime and total
lead time and total cumulative lead time?
Answers were Sorted based on User's Feedback
Answer / manish sharma
Lead Time: This is the amount of time takes to produce the
first assembly, from start to finish on the production line.
Manufacturing Lead Time: The total time required to make an
item if you had all raw materials in stock but had to make
all subassemblies level by level. Oracle Bills of Material
automatically calculates this value, or you can manually
assign a value.
BOM sets an item's cumulative manufacturing leadtime using
the following:
1) Manufacturing leadtime for the item.
+
2) Maximum [(cumulative mfg leadtime - offset days)
for any component in bill]
Total Leadtime: The fixed lead time plus the variable lead
time multiplied by the order quantity. The planning process
uses the total lead time for an item in its scheduling
logic to calculate order start dates from order due dates.
Total Lead Time is the Fixed Leadtime + (Variable Leadtime
* Order Quantity).
Cumulative Total Lead Time: The total time required to make
an item if no inventory existed and you had to order all
the raw materials and make all subassemblies level by
level. Bills of Material automatically calculate this
value, or you can manually assign a value. BOM sets an
item's cumulative total leadtime using the following:
1) Total leadtime for the item.
+
2) Maximum [(cumulative total leadtime - offset
days) for any component in bill]
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / jay
Cumulative Manufacturing Lead Time:
The total time required to make an item if you had all raw
materials in stock but had to make all subassemblies level
by level.
Cumulative Total Lead Time
The total time required to make an item if no inventory
existed and you had to order all the raw materials and make
all subassemblies level by level.
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / shyam sunder khatri
Manufaturing Lead time:- is the time normally required to
produce an item. MLT consists of 5 elements
Queue time, set time, run time, wait time and move time.
Total Manufacturing lead time will be sum of order
preparation and release plus the MLTs for each operation.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / din
Lead Time:
A lead time is the period of time between the initiation of
any process of production and the completion of that process
Manufaturing Lead Time:
The time required to ship the product to the purchaser
Cumulative Lead Time:
The total time required to make a part assuming there is no
Stock of any of its Components including the time to
purchased any components required.
Is This Answer Correct ? | 5 Yes | 9 No |
hOW CAN We define bY Product in Discrete mfg
What setups are done in WIP?
What is an Organization Assignment?
What is this error obutained while assiging an operating unit to Business group. "ID & ID for the flexfield segment Legal Entity does not exist in the value set HR_ORGDDF_OUI_LEGAL_ENTITY. (VALUE=5149)
What all diffrent typw of resources are there?
what is an attribute from which we can distingwish an orgnisation and master item organisation?
what setups are done in BOM?
i have around 10 organisations in our instance . how we can restrict oraganizations access to users . out of 10 mhe has to access /can see only 4
What is the diffrance between std job and non std job?
Will anybody explains abt the modules available in Oracle Apps ????
What is work order less Transaction in WIP?
How do you ensure on and availability are daily base for min max planning?