What all diffrent typw of resources are there?
A Resource is anything required to perform, schedule or
cost an operation for example an employee or machine.
A resource and usage rate for all scheduled activities is
required in a routing. Scheduled resources can include
queue, setup, run, and move time.
Different types of resource can be created to reflect the
actual staging or manufacturing resource being planned.
A resource type can be a person (e.g. technician,
specialist, etc.), a machine or physical space.
Other types are available (amount, currency, miscellaneous)
but only the prior ones will be used at this point .
| Is This Answer Correct ? | 4 Yes | 1 No |
In osp cycyle i have one finished goods -FG1 Raw material - RM1 Osp Item - OSP1 Resource -Ospres01 Charge Type -PO Move I assign dept, then i created routing and bom. then i realsed job the PO requestion Generated But when i replace on another OSP ITEM - OSP2 for OSP1 having same attributes i am not getting Po requestion CAn any one help me? Thanks in advance, Raghunandana raghu.nandana@rediffmail.com
When the Internal Requisition will get generate if I define an OSP operation in sequence 30. 10 & 20 will be other than OSP operations.
What are step included to make a final assembly?
How do you ensure on and availability are daily base for min max planning?
Just now i created one organization then i setup wip parameters in discreate jobs i found only one status 'how to update/create other status?
What are phetom item? How are they user in business case?
I want to create item in Inv org, why it is not taking,it is taking Master organisation,why give the reason.
what are reference designators and how they are used practically .Please site few examples.
Will anybody explains abt the modules available in Oracle Apps ????
What is oracle apps project planning? is it module if so what are the contents of this module? please explain.
What is the diffrance between std job and non std job?
what setups are done in BOM?